After a goof by teh manufacturer the sump has arrived. The design is a dual flow design to allow for two larger frag area's and a seperate side fro the zeo reactor, carbon and floss sponges. Both sides empty into a common return chamber.
I will have 4 1.5 inch true union ball valves to controll the flow into the two sides.
I will have 4 1.5 inch true union ball valves to controll the flow into the two sides.




Comment